Is there a way to add a start date to an attribute added by a global change?

Users may add attributes to multiple constituent records using a Constituent Attribute Global Change and wish to add a Start or End Date, however, these fields are not available in the Global Change's settings.
Attribute Start or End dates can be added after the Attribute Global Change is processed by creating a new Constituent Update batch template that includes the desired attribute. The start or end dates can then be entered either manually or imported into the batch template.