1. Go to the employee record, compensations/deduction tab, and change the schedule to another schedule ID and save.
2. Change it back to the correct schedule and Save.
3. Open the pay type, go to the schedule tab.
4. Switch the radio button to any other option and then back. Save.
5. You should be able to create calculations now.