Changes made to an prospect interaction do not change when made from the interactions page

When making changes to an interaction that originated from a prospect plan, the only way to get changes to save is to edit the interaction from the prospect plan itself.

Download and install the latest version and patch, if applicable. 

Environment

 2.91.1535, patch 40 ; 2.9.1001, patch 80

Was this article helpful?