Incorrect Project ID in Batch Validation Report when posting adjustments from The Raiser’s Edge to General Ledger

When posting a gift adjustment from The Raiser's Edge to General Ledger for a split gift, the Project ID does not match its associated fund.
Download and install the latest patch, which contains all fixes from previous patches. If you are running an older version, download and install the latest version and then the patch. 

Environment

 7.91.5056.28
 7.92.5508

Was this article helpful?