US date format on prospect plan steps

When viewing a prospect plans planned and pending steps from the details tab, the date format is (AU) correct. However, when viewing an individual step, the date format is (US) incorrect. (See attached screen shots.) This is true for every step in the plan.

Download and install the latest patch, which contains all fixes from previous patches. If you are running an older version, download and install the latest version and then the patch. 

Environment

 3.0.516.20
 3.0.516, Service Pack 7

Was this article helpful?