When this column is assigned a value of "Data Sync" it typically mean that an operation was completed (usually within Data management > Import/Export) which opted the constituent out. You can verify this by going to the operations results tab within Import/Export and finding the operations with the same date/time stamp as the opt out date of the constituents.