Users can still updated projected totals on batch with feature permission denied

Application user with the record operation of "Batch: Updated Projected Totals" being denied can still update the projected totals on a batch.

 

Download and install the latest patch which contains all fixes from previous patches. If you are running an older version, download and install the latest version and then the patch.

Environment

 Blackbaud CRM
 4.0
 4.0
 Service Pack 3
 4.0.131

Was this article helpful?