Error: Actual date is required when changing an interaction from a planned step from Completed to another status

When adding Major giving plans, steps can be added which generate linked interactions on the constituent's Documents and Interactions tab. When changing one of these interactions from completed to another status and error message is given.
Download and install the latest patch which contains all fixes from previous patches. If you are running an older version, download and install the latest version and then the patch.

Environment

 Blackbaud CRM
 4.0
 4.0
 Service Pack 5
 4.0.138 Service Pack 1

Was this article helpful?