1. Open the Budget Scenario.
2. Change the Status drop-down menu from Inactive to Active.  (If the Status drop-down is grayed out with Inactive and the Budget Scenario is locked it cannot be edited.)
3. Make the appropriate adjustments.

OR

If the Budget has been finalized, this will also lock all options in place,including the ability to make the budget inactive.