1. Go into > Core > Settings > Integration > Exchange Settings
  2. Click Edit
  3. In the Calendar Time Frame drop down, select a new time frame
Note: Check your start date, if your start date is 3/1/2014 and you change the time frame to 2 years, it will only sync events through 3/1/2016.
  1. Click Save